MAINTENANCE SCHEDULE
In an effort to ensure the highest performance levels, Umoja undergoes standard maintenance updates. To minimize user’s impact, the updates are scheduled during the most convenient hours.
The downtime periods are required for:
- Preventive maintenance
- Disaster Recovery (DR) exercises
- To be used when strictly necessary
- Staff will be notified in advance if the maintenance window needs to be applied
Planned maintenance periods:
- Umoja production systems (ECC/ SRM/ Portal/ IDM/ Citrix/ PI/ BW/ BI) on the first Saturday of the month, for up to 12 hours
- Supply Chain Planning Tool (SCPT) weekend maintenance:
- 24hrs on 27 May 2023
- 4 hrs every Saturday from 08:00 to 12:00 EST/EDT
- Major maintenance window for up to 24 hours on the first weekends of May and November
- Disaster Recovery exercises may require up to 12 hours for each failover/failback; A DR tabletop testing will be performed in Q4 2022 and Q4 2023, and no downtime is required; A full DR exercise with downtime required is planned in 2024.