Maintenance Schedule
In an effort to ensure the highest performance levels, Umoja undergoes standard maintenance updates. To minimize user’s impact, the updates are scheduled during the most convenient hours.
The downtime periods are required for:
- Preventive maintenance
- Disaster Recovery (DR) exercises
- To be used when strictly necessary
- Staff will be notified in advance if the maintenance window needs to be applied
Planned maintenance periods:
- Umoja production systems (ECC/ SRM/ Portal/ IDM/ Citrix/ PI/ BW/ BI) on the first Saturday of the month, for up to 12 hours
- Supply Chain Planning Tool (SCPT) weekend maintenance:
- 24hrs on 29-August, 28-November 2026
- 4 hrs every Saturday from 08:00 to 12:00 EST/EDT
- Major maintenance window for up to 24 hours on the first weekends of May and November
- Disaster Recovery exercises may require up to 16 hours for each failover/failback.
- Umoja Analytics (https://analytics.umoja.un.org)
- 08 hours on 12-September 2026 for quarterly updates.
During deployment periods, Cut-over exercises may require additional downtime.
Umoja System Status
All Umoja applications are available.
Upcoming outages:
- All Umoja production applications will be unavailable for approximately 14 hours on Saturday, 5 September 2026 from 1AM to 3PM EDT (7AM to 9PM CEST).
- Umoja Supply Change Planning Tool (SCPT) will not be available this Saturday, 5-September 2026 from 8AM until Sunday, 6-September 2026 8AM EDT (i.e. Saturday, 5-Sept 2026 2PM to Sunday, 6-Sept 2026 2PM CEST).